Shmerykowsky performed a structural review of the proposed demolition bracing for an existing building. This building was to remain in place during the construction of an adjacent high rise. The structural review of bracing in these cases is absolutely essential for ensuring that both new construction can go on unimpeded and older buildings can avoid structural damage.
Owner/Developer: Boston Properties